The Challenge: A catastrophic short circuit in the main switchboard left a tanker dead in the water (DIW).
Our Solution: Rapid deployment of electrical engineers to clean carbon deposits, replace damaged busbar sections, and re-insulate the entire panel.
Key Outcome: Power restored within 36 hours, preventing costly towage and cargo delays.